image

Click on this image to see a slide show of a new installation

New Pool Installation

 

There are four simple steps to follow to make your dream pool come true and turn your backyard into a paradise!

  • Call us or contact us through our contact page for an appointment.

  • We will then come to assess your property, offer you a variety of options, listen to your needs and price out the job.

  • Then we will lay out your pool and once we get your approval we will obtain all permits required.

  • We then will begin the installation and your pool will be complete in 7 days!

During the entire procedure you can count on the following:

  • Professional Reliable Craftsmanship

  • On Time Service

  • Deal Directly with the Owner

  • Hundreds of happy customers!

  • Owner is on the job during the entire installation

Call or click to fill out form for an appointment to assess property, price the job and sign a contract.  The Pool is laid out in your yard for approval - permits are obtained.

 

Each Pool Installation includes:

  • Steel wall construction - Cardinal Pool Kits

  • Adjustable A-Frame braces - 14 gauge galvanized steel, copper zinc coated

  • Plans and permits

  • All excess excavation dirt removed, yard is leveled

  • Rough grading - 10' around pool

  • Hayward Micro Clear filter, earth or sand - your choice

  • Hayward Multiport

  • Hayward Super Pump 1 1/2 HP installed on filter slab

  • Hayward Chlorinator or Frog Mineral System - your choice

  • 8' S.R. Smith diving board

  • 1 1/2 Flex PVC and Rigid PVC plumbing

  • Aluminum Rimlock Coping or aluminum extrusion

  • All Hayward unions and quick connect plumbing

  • 2 Hayward skimmers

  • 2 Hayward returns - minimum

  • Hayward main drain and manifold

  • Choice of liner - TRIAC 20 or 27 mm.

  • Ropes and floats

  • 3 step S/S ladder - deep end

  • 500 watt underwater light

  • Mood setter lens

  • 8' Triac built-in steps - 3 colors available

  • Manual vacuum set - Pole, hose, head, leaf rake, brush and test kit

  • Start up chemicals

  • Start up demonstration and instructions

 

Optional Extras

  • Electric up to 60'

  • 8' slide with water hook up

  • 4'6" slide with water hook up

  • Side rails for steps

  • Center rail for steps

  • Heater gas - Natural or Propane

  • Heat pumps

  • Solar heating

  • Dolphin auto cleaner

  • Water fall line

  • Triac Spill over spas

  • Poured concrete walls (instead of steel) + $1500





image